Electricity Charge

 

Current Power Rate
         

Unit:RMB /KWh

Usage Classification

KWh-based Charge

Basic Charge

Below     1 KV

1-10   KV

Below 35-110 KV

110      KV

220    KV

Maximum Required Capacity

Transformed Capacity

Yuan/KW/month

Yuan/KVA/month

Household Use

Grade 1

1-150 KWh

0.44

0.458

         

Grade
2

151-400 KWh

0.46

         

Grade
3

401 KWh and above

0.56

         

With shared meters

0.458

         

Non-household Lighting

Single Base Pricing System

0.583

0.568

0.553

       

Commercial Use

Single Base Pricing System

0.863

0.848

         

Non-industrial and General Industrial Use

Normal  Hours

Single Base Pricing System

0.658

0.643

0.628

       

Extreme Peak Hours

Single Base Pricing System

1.1067

1.0812

1.0557

       

Peak Hours

Single Base Pricing System

0.9785

0.956

0.9335

       

Off-peak Hours

Single Base Pricing System

0.3375

0.33

0.3225

       

Large Scale  Industrial Use

Normal Hours

 

0.528

0.513

0.498

0.483

30

20

Extreme Peak Hours

 

0.8857

0.8602

0.8347

0.8092

30

20

Peak Hours

 

0.7835

0.761

0.7385

0.716

30

20

Off-peak Hours

 

0.2725

0.265

0.2575

0.25

30

20

Of which:Production of Chemical Fertilizers

Normal Hours

 

0.23

0.205

   

22

16

Extreme Peak Hours

 

0.391

0.3485

   

22

16

Peak Hours

 

0.345

0.3075

   

22

16

Off-peak Hours

 

0.115

0.1025

   

22

16

Agricultural Use

0.199

0.195

0.189

       

Wholesale Use

Normal Hours

     

0.435

     

Extreme Peak Hours

     

0.5202

     

Peak Hours

     

0.5202

     

Off-peak Hours

     

0.3498

     


Remarks:
1. Double Base power rate is currently applied to large industrial customers. Non-household lighting where the receiver transformer boasts a capacity of over 100 KVA or the lighting devices generates a power no less than 100 KW, non-industrial customers, ordinary industrial customers and commercial businesses shall follow the Single Base Pricing System. The possibility of applying double base power rate to these customers is to be decided.
2. The rate is effective as of Agu.1, 2005 for areas in Xiamen fed by the provincial power grid and Jan 1, 2006 for areas fed by Tong’an’s own power grid.
3.Time Segments:
Extreme Peak Hours:19:00-21:00, Peak Hours: 8:30-11:30, 14:30-17:30, Off-peak Hours: 23:00-7:00 (next day), Normal Hours:7:00-8:30;11:30-14:30;17:30-19:00;21:00-23:00
4. When power supply is needed, customers shall apply to the Electricity Industry Bureau and put into place qualified power receiving equipment. Power supply will be ready in 3 working days upon application for Household use, 7 working days upon application for low voltage power supply, 15 working days upon application for single-base high power supply and 30 working days upon application for double-base high power supply.